Tooling is engineered against the part drawing and the molding process at the same time, so that what gets machined is already the version that will run.
Draft, wall thickness, gate and runner layout, cooling and ejection are examined together. Changes at this stage cost a drawing revision rather than a new insert.
The tool concept, its split lines and the molding window are agreed with the customer before the cavity is cut.
Part drawings or 3D data, the resin you intend to run, and your estimated annual volume.
Machine list, tolerance ranges and capacity figures are pending confirmation from the factory.
We chat